Monday 19 March 2018 photo 2/15
|
Manual 4 post lift: >> http://uti.cloudz.pw/download?file=manual+4+post+lift << (Download)
Manual 4 post lift: >> http://uti.cloudz.pw/read?file=manual+4+post+lift << (Read Online)
1. 9,000lb capacity 4 Post Lift. Installation Manual. Parts Checklist. 1 Main side track with 9/16" hole on cylinder end complete with cylinder, hose and connector. 1 Offside track. 2 Cross Rails pre-assembled with pulleys, pulley covers, and slider blocks. 4 Columns with top caps and bolts. 2 Short rods with heim ends.
The Owner/Employer shall ensure that lift operators are qualified and that they are trained in the safe use and operation of the lift using the manufacturer's operating instructions; ALI/SM 93-1,. ALI Lifting it Right safety manual; ALI/ST-90 ALI Safety Tips card; ANSI/ALI ALOIM-. 2008, American National Standard for
15 Apr 2013 Once post is level, tighten the four anchor bolts to 110 ft-lbs of torque each. SEISMIC - Varies by location consult with your structural engineer and manufacturer's representative. *The supplied concrete fasteners meet the criteria of the American National Standard. “Automotive Lifts - Safety Requirements for
The D-12A Alignment Lift MUST be installed in the configuration shown in Figure 1. For the D-12 ONLY, the power unit can be located at either "X" locations shown in Figure 1 or 2. It is important to locate the POWERSIDE runway (with cylinder) on the SAME SIDE as the power unit location. Utility rails on the side of each.
11 Aug 2014 FOUR POST AUTO / TRUCK LIFT. This instruction manual has been prepared especially for you. Your new lift is the product of over 40 years of continuous research, testing and development; it is the most technically advanced lift on the market today. READ THIS ENTIRE MANUAL BEFORE INSTALLATION
Hello and welcome to the fully updated HAMER Lifting Systems Website where you can view our range of Manually Operated Lifting Platforms for home, hobby lbs) can be elevated up to 1.98m (6' 6") - for the extended height version, or up to 1.32m (4' 4") for the standard version by a series of manual arm movements.
22 Jul 2017
8 Jul 2016 Four Post Lifts. 1. Always inspect the lift for damage and make note of any damage on the bill of lading. 2. In case of freight damage, call the truck line immediately and report the damage as a freight claim. 3. Make sure you have extra help or heavy duty lifting equipment when unloading and assembling the
12000 Pound Capacity Four Post LiftMODEL:94781 (JSZ 5.5A) INSTALLATION AND OPERATION MANUAL Keep this operation manual near the
lift. Danger zone: an area that MUST be kept clear of persons when the lift is in use; refer to “Safety devices" section 1.3 for details. Key to fig 3: 1 Control side post (conventionally the front right-hand post). 2 Front left post. 3 Rear left post. 4 Rear right post. 5 Control side cross-piece (front cross-piece). 6 Rear cross-piece.
Annons