Friday 8 September 2017 photo 18/68
|
Development driller 1 contract: >> http://bit.ly/2xb8goW << (download)
gsf development driller ii
gsf development driller 1
development driller 1 location
ensco 8504
transocean fleet status
transocean dd1
development driller 3
transocean dd2
GSF Development Driller l 1,000,000 lbs rated with 1-3/4 inch drilling line. Compensator. (Main) Active . changes, the contract situation and customer needs.
24 Feb 2016 GSF Development Driller I was built by Singapore's Jurong Shipyard another rig contract as Murphy Oil Corporation terminated the one it had
23 Feb 2016 Transocean (RIG) GSF Development Driller I Contract to Terminate Early E-mail Address. StreetInsider.com Top Tickers, 9/2/2017. 1. PANW 2. In accordance with the terms of this contract, the company will not receive a
18 Jul 2017 Australian oil and gas company Quadrant Energy has hired the GSF Development Driller I for one-well. The semi-submersible is listed as cold
RIGZONE - Offshore oil and gas rig utilization, day rates, contracts, equipment specifications. Proprietary data provided Rig Name: GSF Development Driller I.
20 Jul 2017 Transocean will use the semi-submersible drilling rig named GSF Development Driller-1 for this contract. The GSF Development Driller-1, built
19 Jul 2017 Offshore driller Transocean has been awarded a contract by using the company's semi-submersible rig GSF Development Driller-1 , which is
18 Jul 2017 The GSF Development Driller-1 semi-submersible drilling rig will drill the well, which is being designed as a redrill of the Phoenix South-2 well.
15 Aug 2017 Vessel details about GSF DEVELOPMENT DRILLER I include Current Vessel Position, Voyage information, and photos. Wind direction: N (1o) Transocean secures semi-submersible contract from Quadrant Energy.
18 Jul 2017 Rig contract for Phoenix South-3 well now signed with sixth The GSF Development Driller-1 semi-submersible drilling rig (pictured below) will
Annons