Friday 30 March 2018 photo 25/41
|
epa remedial action costing procedures manual
=========> Download Link http://lopkij.ru/49?keyword=epa-remedial-action-costing-procedures-manual&charset=utf-8
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
United States Environmental Protection Agency Hazardous Waste Engineering Research Laboratory Cincinnati OH 45268 Research and Development EPA/600/S8-87/049 Dec. 1987 Project Summary Remedial Action Costing Procedures Manual Brian Burgher, Mike Culpepper, and Werner Zieger The full manual. EPA Home » Science Inventory » REMEDIAL ACTION COSTING PROCEDURES MANUAL. The manual provides specific procedures for the cost estimating and economic analysis steps required for preparing engineering cost estimates for selecting remedial action alternatives in response to the requirements of the. "A Guide to Developing and Documenting Cost Estimates During the Feasbiility Study" addresses cost estimates of remedial alternatives developed during the. To help achieve these goals, the document presents clear procedures and expectations, a checklist of cost elements, and example formats. This document updates and clarifies previous USEPA guidance for developing and documenting remedial alternative cost estimates during the feasibility study. Previous guidance superceded by this document are Chapter 3 ofRemedial Action Costing Procedures Manual, October 1987 (EPA/600/8-87/049), and Section. 105. U.S. EPA, CERCLA Compliance with Other Laws Manual, Draft Guidance, EPA/540/G-89/006, Office of Emergency and Remedial Response, Washington, D.C., 1988,1:15. 106. U.S. EPA, Remedial Action Costing Procedures Manual, EPA/600/8-87/049, U.S. EPA Office of Solid Waste and Emergency Response,. Costs of Remedial Actions at Uncontrolled Hazardous Waste Sites: Worker Health and Safety Considerations. U.S. EPA Project Summary EPA/600/S2-86/037. September 1986. Smit, Sr., K., Ed. Means Site Work Cost Data. R.J. Grant. 1991. U.S. EPA. Remedial Action Costing Procedures Manual. EPA/600/S8-87/049. 1987. U.S. Environmental Protection Agency, 1987c, Remedial Action Costing Procedures Manual, EPA/ 600/ 8-87/ 049, Washington, D.C., Oct. U.S. Environmental Protection Agency, 1988a, Guidance for Conducting Remedial Investigations and Feasibility Studies under CERCLA, Interim Final, EPA / 540/ G-89/ 004 (OSWER. Remedial Design and Remedial Action Field Operations and Safety Procedures. 9355.5-01 EPA/540/G-90/001 NTIS Order No.. PB91-921355/CCE Price Code: A01 Remedial Action Costing Procedures Manual October 1987 OERR/HSCD 68 pages Publication Lll Provides detailed procedures for calculating and. ORD has developed two publications on costing remedial actions: Compendium of Costs of Remedial Technologies and Remedial Action Costing Procedures Manual. These documents contain analyses of actual expenses incurred during the remedial responses for several major types of engineering technologies and. 1986. U. S. Environmental Protection Agency. Remedial Action Costing Procedures Manual. EPA/600/8-87/049. NTIS PB88-1 13691. The Author. Washington. D.C.. 1987. U. S. Environmental Protection Agency, Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA. EPA/540/G-89/004. Phytoremediation of organic and nutrient contaminants. Environmental Science and Technology. 29, 7. Schrauf, T.W. 1996. A well-developed cleanup technology. Environmental Protection. May 1996. 24-25. USEPA. 1985. Remedial Action Costing Procedures Manual. EPA/OERR/HSCD; EPA Report #600/8- 87/049. Description, Cincinnati, OH : U.S. Environmental Protection Agency, Hazardous Waste Engineering Research Laboratory, [1987] [2] p. ; 28 cm. Notes. Caption title. Distributed to depository libraries in microfiche. Shipping list no.: 92-0411-M. "Dec. 1987." "EPA/600/S8-87/049." Reproduction, Microfiche. [Washington, D.C.?] disclaimer. Remedial Action Costing Procedures Manual The U.S. Environmental Protection Agency (EPA) was introduced on December 2, 1970 by President Richard Nixon. The agency is charged with protecting human health and the environment, by writing and enforcing regulations based on laws passed by Congress. Protection Research and Sanctuaries Act (MPRSA). Additional guidance on ARARs is provided in the. “CERCLA Compliance with Other Statutes" manual. (U.S. EPA, Draft, August 1988). Section 121(d)(4) of CERCLA identifies six circumstances under which ARARs may be waived: ○. The remedial action. Public Participation Policy and Procedures Manual Updated *October 2001. Chapter 3, Page. Handbook, published January, 1992 by the U.S. EPA lists required and suggested public participation activities relevant to Superfund response actions.... Total cost of the Remedial Action Plan Equivalent must be less than $2. Construction. Field Standard Operating Procedures (FSOP). Techniques/Procedures RCRA Facility Assessment (RFA) Guidance. RCRA Facility Investigation (RFI) Guidance. ORD/OERR/OWPE. 59. Costing Techniques. Remedial Action Costing Procedures Manual. Removal Cost Management Manual. OSWER/OERR. 61. The purpose of this section is to identify the criteria as well as the methods and procedures EPA uses to establish its priorities for remedial actions.. A site's rank on the NPL serves, along with other factors, including enforcement actions, as a basis to guide the allocation of Fund resources among releases. EPA/540/G-89/006, October 1988 and Remedial Action Costing Procedures Manual, EPA-600-. 8-87-049, October 1987. Estimating remedial action costs should include the entire cost of the remedial action alternative, including the cost of mobilization, treatment, disposal, site restoration, monitoring, and. Field Standard Operating Procedures (FSOP) OSWER/OERR. RCRA Facility Assessment (RFA) Guidance OSWER/OSW. RCRA Facility Investigation (RFI) Guidance OSWER/OSW. Remedial Action Costing Procedures Manual OSWER/OERR. Removal Cost Management Manual OSWER/OERR. Page. 39. 41. 43. 45. 47. City of Atlanta-Invest Atlanta Brownfields Revolving Loan Fund Program Procedures Manual ii | Page. Contact Information... delegated agency. In addition, a Remedial Action Plan must be approved by the Georgia. Borrowers and subgrantees may not use EPA funding to pay for cleanup costs at a. Brownfields site where. SUBJECT: DoD/EPA Joint Guidance on Streamlined Site Closeout and NPL Deletion. Process For DoD. I. Background. This guidance document describes the recommended streamlined procedures for the completion. A Guide to Preparing and Reviewing Remedial Action Reports of Cost and Performance,. Engineering. Remedial Actions, and Guidance for Beneficial Water Use Determinations at Environmental Cleanup. Sites.. for completing an FS as described in EPA's Guidance for Conducting Remedial Investigations and Feasibility. Studies.... Action. Costing Procedures Manual, EPA-600- 8-87-049, October 1987. The NERP Manual is meant to be a user-friendly tool for remedial program managers and engineers. It summarizes the... 1.12.3 Executive Order 12898 (Federal Actions to Address. Environmental Justice in Minority.... environmental procedures to achieve timely and cost-effective cleanup. • Serve as the. Bay site in an example application of the remedial action cost module of SEDQUAL, a menu- driven sediment quality. Spreadsheets followed a method of calculation similar to that used in the Commencement Bay FS report (Tetra Tech... The EPA Remedial Action Costing Procedures Manual (U.S. EPA 1985). Suggests a. The purpose of this guide is to provide information on conducting treatability studies. It describes a three-tiered approach that consists of 1) remedy screening, 2) remedy-selection testing, and 3) remedial design/remedial action testing. It also presents a protocol for conducting treatability studies in a. processes and procedures used to avoid or recover costs associated with response actions from PRPs. Release 1-1669. 7/02/01. BLM MANUAL.. the EPA. CERCLA defines response as removal, remedial, and enforcement actions. The purpose of this chapter is to provide guidance and convey BLM. The ground water remedial action permit can be applied towards the end of the remedial action and if any of the.. RACER (Remedial Action Cost Engineering and Requirements)... The August 2005 edition of NJDEP's Field Sampling Procedures Manual replaces the 1992 edition as the most current. of NPL sites must be conducted in accordance with EPA's National Con- tingency Plan (NCP), which, as discussed below, provides procedures for conducting removal and remedial actions. States may obtain reimburse- ment from the Fund, subject to the above-described cost-sharing provi- sions of section 104(c)(3) of. The Association of State and Territorial Solid Waste Management Officials (ASTSWMO) Remedial. Action Focus Group (FG) is comprised of State and Territorial (State) members from all EPA regions. This document was prepared by the ASTSWMO Remedial Action Focus Group, with assistance from the U.S. Environmental. [6] Estimated O&M Costs For RODs: Historical Trends And Projected Costs Through. Fiscal Year 2040, Page 3-5, by CH2M Hill, May, 1995. [7] "Remedial Action Costing Procedures Manual," EPA/600/8-87/049, Page 3-21, published October, 1987. [8] "Resource Requirements for NPL Sites," Milton Russell, Kimberly Davis,. k. DoD/EPA Joint Guidance on Streamlined Site Closeout and NPL Deletion. Process for DoD Facilities, January 2006 l. OSWER Directive 9320.2-22, Close Out Procedures for National Priorities List. Sites, May 2011 m. FUSRAP Management Requirements and Policies Manual, U.S. Department of. Energy. Department of Energy (DOE) G 413.3-21, Cost Estimating Guide d.. Sites Remedial Action Program (FUSRAP), EPA/Superfund, Army Base Realignment. removal programs cost estimates prepared for others must also comply with the procedures required by those entities, such as the DOE and the EPA. MPCA staff intend to use the policies and procedures in the proposed manual as guidelines to evaluate the need for investigation or remedial actions to address releases and threatened releases of hazardous substances or pollutants or.... Protection Agency (EPA) guidance for presumptive remedies. This guidance has. for remedial action; and support technical and cost analyses of alternatives. The remedial investigation is usually done with the feasibility study. Together they are usually referred to as the “RI/FS" (US EPA, 2004b, http://www.epa.gov/OCEPAterms/rterms.html). Remedial Process – the full sequence of actions taken to. The purpose of this Remedial Design/Remedial Action Statement of Work (RD/RA SOW) is to define the procedures the Respondent(s) shall follow in designing and implementing the selected remedy for the.. analyses to develop quantitative performance, cost and design data for the selected remedy. At the discretion of. EPA/540/F-94/009. PB93-963422. December 1993. Conducting Non-Time-Critical. Removal Actions Under. CERCLA. Office of Emergency and Remedial Response. Hazardous Site. with EPA's. Emergency Response Division (ERD) Superfund Removal Procedures (SRP) manual which provides detailed guidance for. A Practical Guide to Estimating. Cleanup Costs. Cost estimates are frequently developed to evaluate hazardous-waste-site cleanup options in support of a site investigation, remedy. be necessary to perform the remedial action and then document.. Documenting Cost Estimates during the Feasibility Study (USEPA, 2000). EPA may exercise its discretion in a manner that increases a PRP's remedial action costs or lessens those costs. Thus.. A working familiarity with these risk assessment manuals, procedures and regulations is necessary throughout the entire process of negotiating a consent decree in order to understand EPA's viewpoint. advantage to a PRP in terms of its ultimate costs at a hazardous waste site. THE EPA'S. (40 CFR Section 300) establishes a rather lengthy and complicated set of procedures that the EPA must follow in selecting an appropriate remedial action.... CERCLA (6/12/87); Potentially Responsible Party Search Manual (8/87);. This document updates and replaces the “Superfund Removal Procedures Action Memorandum. Guidance... Engineering Evaluation/Cost Analysis (EE/CA) approval memo documents the. initiate removal actions costing up to $250,000 in an emergency and up to $50,000 in a non-emergency context. (a)General -. (1)Introduction. The purpose of the remedy selection process is to implement remedies that eliminate, reduce, or control risks to human health and the environment. Remedial actions are to be implemented as soon as site data and information make it possible to do so. Accordingly, EPA has established the. The EPA anticipates that it will be more cost-effective to use its remedial authority than to use its removal authority to respond to the release.. A site may undergo remedial action financed by the Trust Fund established under CERCLA (commonly referred to as the ``Superfund'') only after it is placed on the. Photovoltaic. RACERTM. Remedial Action Cost Engineering Requirements. RCRA. Resource Conservation and Recovery Act. RP. Responsible party. RPO. Remedial Process Optimization. RR. Remediation and Redevelopment. SERG. Smart Energy Resources Guide. SF6. Sulfur hexafluoride. SOx. Sulfur oxide emissions. Weston provided rapid, cost-effective remediation of a former U.S. Radium facility in Pennsylvania hampered by numerous legacy radiological issues through. of an on-site procedure to operate a liquid scintillation counter to analyze over 3,000 tritium smear samples resulting in savings to EPA in off-site analytical costs. in relation to the underwriting of costs for remedial actions following anticipated events (including closure) or.... Landfill Manuals – Landfill Restoration and Aftercare (EPA, 1999);. ➤ Environmental Management in... (cover) necessary. The ELRA procedure is based on the standard risk assessment principles presented in. The EPA and state agencies use the Hazard Ranking System (HRS) to calculate a site score (ranging from 0 to 100) based on the actual or potential release of hazardous substances from a site. A score of 28.5 places a site on the National Priorities List, eligible for long-term remedial action (i.e., cleanup) under the. Then, determine the universe of options available for cleaning-up the contamination, and narrow these technologies down to the best option for the site. Guidance Manuals for this stage of the process include: EPA RI/FS Guidance: EPA guidance on Remedial Investigations/Feasibility Studies & Treatability Studies & Costing. INTRODUCTION. 1.1. Purpose of the SOW. This Statement of Work (SOW) sets forth the procedures and requirements for implementing the Work. 1.2. Structure of the SOW. Section 2 (Community Involvement) sets forth EPA's and. Settling Defendants' (SDs') responsibilities for community involvement. Army Cost and Economic Analysis Center (CEAC) – This web site provides information about Army cost procedures, cost data, models, and research conducted. Guide to Developing & Documenting Remedial Alternative Cost Estimates During the Feasibility Study (2000) – Updates and clarifies previous EPA guidance for. and guidance for designing and implementing selected remedial actions at Remedial. Response sites. The listed. Ambient Air second edition, Compendium Method TO-14A, EPA/625/R-. 96/010b, U.S. EPA, January. 1-882417-46-1, 2002. NIOSH Occupational Safety and Health Guidance Manual for Hazardous Waste. CERCLA cost-recovery actions challenging the EPA's costs is a heavy one indeed. CERCLA. for "all costs of removal or remedial action incurred by the [U.S.] Government or a State or an Indian tribe not... "an environmental cleanup could conceivably follow a standard procedure consistent with the NCP, even if the NCP. management options to achieve sediment quality targets and estimates of costs associated. Nonremoval techniques involve the remediation of contaminated.... Burgher, B., M. Culpepper, and W. Zieger. 1987. Remedial action costing procedures manual. EPA/600/8-87/049. Prepared for U.S. Environmental Protection. Trend in EPA Remedial Action Project Completions and Construction Completions at. Nonfederal National.. 5GAO, Superfund: EPA's Estimated Costs to Remediate Existing Sites Exceed Current. Funding Levels. Program Implementation Manual, and interviewed EPA officials, including. 6At the time of. SUBJECT: Approval of the Remedial Action Report for Operable Unit 1 (former facility property), Li Tungsten. Superfund Site, Glen.. a cost recovery settlement with the City of Glen Cove (a PRP as a result of previous ownership... Radiological Site Survey and Investigation Manual ("MARSSIM") (EPA 402-R-97-016) and. Waste Disposal Sites," EPA-625/6-82-006, Cincinnati, OH, 1982. U.S., Environmental Protection Agency, Office of Emergency and Remedial. Response, "Interim Standard operating Safety Guides," Sept. 1982. U.S., Environmental Protection Agency, "Remedial Action Costing Procedures. Procedures Manual," Final Draft,. Page 8 of 262. The Remediation Closure Guide sets forth policies and procedures applicable to all of IDEM's.... educational assistance, and works in partnership with the U.S. Environmental Protection Agency (U.S. EPA).... action costs and third party claims associated with confirmed releases from regulated petroleum. The Superfund Remedy Report (SRR), Fifteenth Edition, was published by the EPA Office of Superfund Remediation and Technology Innovation (OSRTI) in August 2017. The report focuses on Superfund remedial actions selected in fiscal years 2012, 2013 and 2014, and on remedy trends since 1982. or procedures in specific applications of any technology. Consequently.. Regulatory Council RPO Team developed this guide to respond to that realization. With. Cost. Savings ? Time. Savings. Figure ES-2. Effort vs. time in remediation actions with RPO. (Modified from U.S. Navy 2003.) This document provides interested. EPA/Na vy CER CLA. Remedial Action. * Technology Guide. Prepared by the: U.S. Environmental Protection Agency. Naval Facilities Engineering Service Center.... Cost. permeability, and chemical composition. Depths of more than 150 feet or the presence of debris or boulders requires increasingly complex. Resulting. manage all hazardous wastes from cradle to grave. (i.e., from generation to ultimate disposal), while. CERCLA authorizes a number of government actions to remedy the conditions that could result in a release or the effects of a release itself. Both. RCRA and CERCLA authorize EPA to act in the event of an imminent hazard.
Annons