Wednesday 18 October 2017 photo 5/15
|
Papa terra tlp installation guide: >> http://gki.cloudz.pw/download?file=papa+terra+tlp+installation+guide << (Download)
Papa terra tlp installation guide: >> http://gki.cloudz.pw/download?file=papa+terra+tlp+installation+guide << (Read Online)
Apr 9, 2014 of the P-61 Tension Leg Wellhead Platform ("TLWP") for the PPT BV Keppel FELS Ltd. ("Keppel FELS") and McDermott, the successful installation of the Papa Terra P-61 is a continued support and guidance to our staff.
Apr 1, 2014 McDermott has completed installation of the extended TLP on the Papa Terra field for Petrobras.
Papa Terra is the first use of dry-tree floating technology offshore Brazil and the first Tension. Leg Platform installation offshore South America. The project draws
Apr 10, 2014 tensioned leg platform papa terra p-61 mcdermott Image: McDermott. McDermott International has announced the successful installation this
Papa Terra field is a heavy crude oil field in block BC-20 of the Campos The P-61 TLWP was designed by FloaTEC and will be installed in 1,180m of water.
The first Tension Leg Platform (TLP) was installed in 1984 to develop the Hutton field in the Central North . Design guidelines for maximum and . (West Seno) and Brazil (Papa Terra) were also installed or sanctioned in this period. Both are
Dec 19, 2008 Petrobras could cancel a tender for the P-61 oil platform after prices first TLP installed in Brazil, destined for production at the Papa Terra field
Abstract This paper presents an EPCI project for pre-installation of 15 x 36?? conductors, 60 m long, to be integrated to a TLWP in Papa Terra Field at Campos
Apr 9, 2014 McDermott International, Inc. has installed the P-61 Tension Leg Wellhead Platform (“TLWP") for the PPT BV Joint Venture, consisting of
Oct 1, 2015 First production from Papa Terra this March signaled the successful completion of P-61 was installed in April 2014 connected to a tender assist drilling rig activities in line with its own internationally-recognized guidelines.
Annons