Monday 19 March 2018 photo 7/15
![]() ![]() ![]() |
Nyc dob drawing standards manual: >> http://dsx.cloudz.pw/download?file=nyc+dob+drawing+standards+manual << (Download)
Nyc dob drawing standards manual: >> http://dsx.cloudz.pw/read?file=nyc+dob+drawing+standards+manual << (Read Online)
and shall promptly advise DDC of problems with or conflicts among drawings, specifica- tions, and site construction documents Title sheet or General Notes sheet and all DOB filings. Before construction The design shall comply with all applicable codes, zoning regulations, laws, guidelines, and other requirements of
30 Apr 2014 The following must be included on all drawings: • Compliance with DOB Graphic Standards*. • Title Block, discipline designators and revision numbers as per DOB requirements*. • Scale of each drawing or detail. • North Arrow on plans. • Dimensions – related to scope and area of work. • Drawing Title.
Plan Examination. The Administrative Provisions in Chapter 1 of Title 28 of the NYC Administrative Code that govern the NYC Construction Codes including the NYC Building Code require that construction documents must be complete when a project application is submitted by the applicant. Chapter 1 of Title 28 of the
Title block format is for information and content purposes. Consultant can determine graphic format. Designated space for DOB approval stamps. A minimum of 3" x 3" of clear space must be provided on the lower right hand portion of each sheet. This space must be directly to the left of the title block. Standard Sheet Sizes.
Provide and submit one (1) unbound set of plans with wet ink signatures and stamps. Only one (1) set of plans shall be submitted at initial filing. This set will be used for plan examination and other reviews. Upon approval, two additional sets shall be submitted. The approved review set will become the DOB record set and
8 Mar 2018 General Submission Guidelines. All new construction and alteration projects must include sufficient detail for the entire scope of work and comply with the NYC Building Code, Zoning Code, and any additional Federal, New York State, and city requirements. According to the DOB Plan Examination
15 Nov 2013 A previously instituted version, Hub Self-Service, allowed New York State-licensed architects,engineers and licensed contractors to professionally certify plans to e-file, as explained at the DOB's e-filing user guide, and all plans must follow the Department's Drawing Standards for Plan / Work Applications.
6 Apr 2015 Acrobat 6.0 (PDF 1.5). • Color or greyscale allowed. • Embedded images in drawings shall use. JPEG compression set to medium image quality. • Fonts and graphics should follow the guidelines for plan submissions currently published on the DOB website: home2.nyc.gov/html/dob/downloads/.
Complete Applications. Plan examiners will begin the review process only when drawings are complete. Each project is unique, and the amount of required information and details vary. Please refer to the Plan Examination Guidelines for more information.
16 Mar 2009 specific guidelines or the plans will not be approved. This B-SCAN enhancement plan; however, the DOB identification number must be located on the lower right hand side of each drawing sheet. ? Discipline designators comport with national CAD standards or are specific to DOB application work types.
Annons