16. Earthing Device. No. 27. 17. 50x6 mm GI flat. Mtr. 100. 18. 25x6 GI flat. Mtr. 130. 19. Flexible earth Cu Band. No. 6. 20. Pad Clamp suitable for 100mm? AAAC. No. 30. 21. Pad Clamp suitable for 232mm? AAAC. No. 18. 22. T Clamp suitable for 232/232 mm? AAAC. No. 12. 23. 33KV Danger Board. No. 5. 24. 11KV Danger
Substation Design Manual i. Reference NI000401R121 Ver 2. Ergon Energy Corporation Limited ABN 50 087 646 062. Ergon Energy Queensland Pty Ltd ABN 11 121 177 802. Revision History. Version Description of Change. Approval. Date. Revised By. 1. Initial version. 25/03/2013. Draft 2a Content revised and
The following are the general particulars governing the design and working of the complete system of which the Contract appropriate voltage level via distribution sub-stations, which operate at 33/ 11kV, 33/ 0.4 KV or 11/0.4 KV. The Contractor shall finalize the layout arrangements in case of new substations in line with.
ABSTRACT - The thesis deals with the analysis of Construction of Power Lines and Substation Switchyard of 33/11 KV. In today's life for 33 KV line provided length of parallelism does not exceed 1.6 Km. For greater distances minimum “separation distance design, utilization purpose, installation methods, and so on.
24 Mar 2014 Supply, Erection and Commissioning of 33/11 kV GIS Sub-Stations and 33kV, 11kV & LT. Network line (Package-II) of Odisha Power Sector Emergency Assistance Project. (OPSEAP) proposed to be funded by ADB and is based on the Standard Bidding. Document for Procurement of Plant – Design, Supply
The aim of this project is to provide the consultancy service to Doctor Harisingh Gour Vishwavidyalaya, Sagar (MP) for substation design, feeder up to 11 kV and estimation of cost. There are two phases. In Phase-I, a study of existing network and availability of space for the substation and lines (up to 11 kV) of the campus is
Regulation 5(2)(o) of the Infrastructure Planning. (Applications: Prescribed Forms and Procedure). Regulations 2009. 4.8.5. D o c u m e n t. Page 2. 33kV COMPOUND. 33kV CONTROL BUILDING. ACCESS ROAD. 132kV CONTROL BUILDING. 132kV COMPOUND. YN. CENTER. CENTER. A13. B13. C13 a2 b2 c2.
1 Aug 2011 Rengali 132/33 KV Grid to the proposed 33/11 . Construction of New 33/11 KV or Higher Voltage. Class substation. 1 No. 2. (i) Construction of New 33 KV Line or. (ii) Construction of New 11 KV Line. (i) 15 Km . Providing Engineering drawing, data, operational manual, etc for the Purchaser?s approval;.
The project work assigned to us was to 132/33 KV EHV substation - electrical design . The power from main bus was fed into a 20MVA transformer which.
I. INTRODUCTION. The work designated to the students was to design a 132KV/33KV EHV sub-station. The work was carried out under Prof. S. Pal, H.O.D.- EE dept., Techno India. Any sub-station which handles power at over. 33KV is termed as extra High Voltage sub-station by the rules implemented by Indian