WisDOT Bridge Manual. Chapter 2 – General. July 2017. 2-17. 2.7 Contracts. Contracts are administered by construction personnel in the Regional Office where the project is located. The Bureau of Project Development coordinates the activities of the Regional. Offices. The contract contains the plans, specifications,
WisDOT Bridge Manual. Chapter 14 – Retaining Walls. January 2018. 14-1. Table of Contents. 14.1 Introduction . .. 14.3.1.14 Traffic barrier . 23. 14.3.2 Wall Selection Guide Charts .. 23. 14.4 General Design Concepts .
3 Jan 2017 WisDOT Bridge Manual. Chapter 18 – Concrete Slab Structures. January 2017. 18-17. 18.4 Concrete Slab Design Procedure. 18.4.1 Trial Slab Depth. Prepare preliminary structure data, looking at the type of structure, span lengths, skew, roadway width, etc.. The selection of the type of concrete slab
2 Jul 2017 Chapter 17 provides more detail on applying this load for design. WisDOT requires a specific vehicle design check using the Wis-SPV (Standard Permit Vehicle) which can be found in Chapter 45. Railroad loadings are specified in the AREMA Manual for Railway Engineering. All new bridges constructed in
WisDOT Bridge Manual. Chapter 36 – Box Culverts. January 2018. 36-17. HBF. W c s e. E ?. = In which: c e. B. H. 20.01. F. +. = Where: WE. = Total unfactored earth load (kip/ft width). Fe. = Soil-structure interaction factor for embankment installations (Fe shall not exceed 1.15 for installations with compacted fill along the
WisDOT Bridge Manual. Chapter 24 – Steel Girder Structures. January 2018. 24-17. WisDOT policy item: For skews greater than 15 degrees, the cross frames and diaphragms must be placed perpendicular to the girders. Typically, the cross frames or diaphragms can be staggered. This arrangement reduces the transverse
WisDOT Bridge Manual. Chapter 5 – Economics and Costs. January 2012. 5-17. Structure Type. No. of. Bridges. Total. Area. (Sq. Ft.) Total Costs. Super. Only. Cost Per. Square. Foot. Cost per. Square. Foot. Prestressed Concrete Girders. 44. 337,346 31,596,585. 65.90. 93.66. Steel Plate Girders. 0. Reinf. Conc. Slabs (All
Bridge Manual. Chapters · Standard Drawings · Insert Sheets · MicroStation Resources · Updates Archive. Updates to the Bridge Manual chapters occur about every six months. Sign up to receive updates to the Bridge Manual. Description, Updated. Chapter 1 - Index, 01/17. Chapter 2 - General, 07/17. Chapter 3 - Design
WisDOT Bridge Manual. Chapter 17 – Superstructure - General. January 2018. 17-3. 17.1 Design Method. 17.1.1 Design Requirements. All new structures and deck replacements are to be designed using AASHTO LRFD Bridge. Design Specifications, hereafter referred to as AASHTO LRFD. Bridge rehabilitations and.
Bridge Manual Standard Drawings Abutments | Accelerated Bridge Construction | Aesthetics | Bearings | Box Culverts | Bridge Rehabilitation | Concrete Slab Structures | Expansion Devices | Floor Drains | Foundation Support | Materials | Pedestrian Bridges | Piers | Prestressed All - All Chapter 17 Standards, 01/18.