28 May 2014 The use of flow metering devices in fire pump installations has been gaining popularity over the years. Flow meters are devices installed in a water pipe that, if installed properly and in accordance with the manufacturer's instructions, will provide a visual reading of water flowing at any given moment.
10 Apr 2012 Figure 2b – Instructions for Non-Flow Pump Test Data Input Form (continued). 25. Table 2 – Performance Test Data To Collect. 26. Table 2A - Key to Columns in Table 2. 29. Figure 3a – Performance Test Data Collection Form – Fire Pump Information. 30. Figure 3b – Performance Test Data Collection Form
for fire pumps. This document is not intended to serve as a guide specification. B. The design guidelines contained herein include the requirements for fire pump systems at The to provide a minimum standard for the installation of fire pump systems at the . Provide a fire pump test header with a 2-1/2" hose valve for every.
30 Apr 2000 Firepak fire booster systems are completely self-contained package pumping units, factory assembled, wired, tested and pre-adjusted before shipment to suit the specified conditions. These systems are ready to receive suction and discharge piping and to be connected to power supply. The Vertical In-Line
15 Nov 2012 Where determined to be necessary through hydraulic analysis or other purposes, a fire pump installation provides for the required water flow and pressure .. Where a fire pump test header is installed, NFPA 20 requires that it be installed on an exterior wall or in another location outside the pump room that
11 Sep 2013 jockey pump control panel fire pump control panel elbow elbow system to test tee butterfly valve ball drip valve outside wall outside header hose valve with cap and chain butterfly valve flow meter globe valves installed per nfpa20. (see sketch on page 3) back to fire pump supply os & y suction gate valve.
Isolate the fire pump from the fire protection system by closing the discharge OS&Y valve, and opening either the indicating control valve to either the pump test header or pump flow loop, depending on the type of installation. ? If a test header is used, connect the playpipes with nozzles and hose lines to the pump test
Do not use a flow meter in lieu of hose streams when making an acceptance test. The accuracy of a flow meter depends on proper installation, initial adjustment and periodic recalibration. The initial adjustment and calibration is usually determined by flowing water through the pump header and. GAPS Guidelines. 2.
installed to protect against skin contact with hot piping or pump components. Failure to follow these instructions could result in serious personal injury, death or property .. 2. The discharge valve leading to the building's fire system is closed. 3. The discharge valve leading to the hose manifold (or “test header") is opened. 4.
Field Reports: Indicate summary of hydrostatic test and field acceptance tests performed in accordance with NFPA 20. Manufacturer's Installation Instruction: Indicate support details, connection requirements, and include start?up instructions for fire pump system. Provide certificate of compliance from authority having