August 1977. U.S. NUCLEAR REGULATORY COMMISSION. REGULATORY GUIDE. OFFICE OF STANDARDS DEVELOPMENT. REGULATORY GUIDE 1.100. SEISMIC QUALIFICATION OF ELECTRIC. EQUIPMENT FOR NUCLEAR POWER PLANTS. A. INTRODUCTION. Criterion III, "Design Control," of Appendix B,.
Power Reactors (Division 1): Regulatory Guides 1.81 - 1.100. This page lists the number, title, publication date, and revisions for each regulatory guide in Division 1, "Power Reactors," with references to draft guides and related documents (where applicable). See also Draft Regulatory Guides for Division 1. See NRC
30 Jun 1988 .4 o%" U.S. NUCLEAR REGULATORY COMMISSION. June 1988 !REGULATORY GUIDE. OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 1.100. (Task EE 108-5). SEISMIC QUALIFICATION OF ELECTRIC AND MECHANICAL EQUIPMENT. FOR NUCLEAR POWER PLANTS.
B. DISCUSSION. Background. The NRC issued Revision 2 of Regulatory Guide (RG) 1.100, “Seismic Qualification of Electric and Mechanical Equipment for Nuclear Power Plants" (Ref. 4), in June 1988. With a few exceptions and clarifications, it endorsed the Institute of Electrical and Electronics Engineers (IEEE) Standard.
27 Jul 2009 During the 564th meeting of the Advisory Committee on Reactor Safeguards, July 8-10, 2009, we reviewed the Draft Final Revision 3 to Regulatory Guide (RG) 1.100, “Seismic Qualification of Electrical and Active Mechanical Equipment and Functional Qualification of Active. Mechanical Equipment for
NRC Reg Guide 1.100 Seismic Qualification of Equipment. - Kamal Manoly, US NRC Senior Technical Advisor for Structural Mechanics. - December 4, Tuesday, 8am-12pm. Appendix S to 10 CFR Part 50 states that the SSCs required to withstand the effects of the safe-shutdown earthquake (SSE) ground motion or surface.
Reviewed dates (the last column in the table) are when the staff completed a periodic review of the associated guide. Regulatory Guides are reviewed about every 10 years, although in some cases a guide will reviewed before the normal 10 year period. The NRC began these reviews in 2010, and began posting the results
Reviewed dates (the last column in the table) are when the staff completed a periodic review of the associated guide. Regulatory Guides are reviewed about every 10 years, although in some cases a guide will reviewed before the normal 10 year period. The NRC began these reviews in 2010, and began posting the results