Sunday 1 April 2018 photo 24/30
|
Smart siding installation instructions: >> http://qnb.cloudz.pw/download?file=smart+siding+installation+instructions << (Download)
Smart siding installation instructions: >> http://qnb.cloudz.pw/read?file=smart+siding+installation+instructions << (Read Online)
There are no National Standards for wood composite substrate trim. • LP SmartSide trim and fascia can be applied directly over materials such as siding, or nailed directly to structural members up to. 24 in. O.C.. • All fascia must be supported with solid wood subfascia. Strand based fascia may be installed without subfascia
29 Jun 2015
29 Jun 2015
Trim and fascia must be applied in a manner that will not allow moisture intrusion or water buildup. • LP® SmartSide® siding is not designed and/or manufactured to be used as trim or fascia. LP SmartSide trim and fascia are available in a variety of dimensions. Trim. • Install kick-out flashing to direct the water into the gutter.
LP Siding. Minimum 1" clearance. between trim and roofing. Clean rain. gutter. Do not run trim or siding inside. 3/4 in. nail. spacing. 1 in. overlap. Self-aligning. Outside Corner. Detail. Over Openings. Alternate Butt Joint Treatments. Inside Corner. Detail. Figure 3A. Figure 3B. Figure 3. Figure 3C. Figure 3E.
sealant. Follow the sealant manufacturer's instructions for application. • Use a high-quality exterior sealant meeting the ASTM C920, minimum Class 25 sealant. Stud Spacing. • Strand Substrate 38 and 76 Series panel siding must be installed on 16 inch o.c. framing only. When installing on 24 inch o.c. framing, 190 Series
Trim and fascia are not designed for siding; or structural applications and should not be used as a structural member in construction such as a trellis, railing, fencing, decking, decking trim or sills. • When integrating flashing with a water-resistive barrier (WRB), be sure to follow the WRB installation instructions. • Install siding
6 Oct 2015 That wraps up my list of the most common installation defects for LP SmartSide®. Again, this is not a full list of defects. For the full list of installation instructions, and for more information on this product, click here: lpcorp.com/products/siding/lp-smartside-trim-siding/. Why does this stuff matter? Because
wood siding. • Follow the coating manufacturer's application and maintenance instructions. DO NOT USE. • Semi-transparent and transparent stains. • Shake and shingle paints. • Vinyl-based resin formulas such as vinyl acetate, PVA, vinyl acetate/acrylic copolymer paints. HANDLE PREFINISHED LP SMARTSIDE
Nailing Instructions. • LP SmartSide 76 Series lap siding may be attached directly to framing members spaced up to a maximum of 24 in (600 mm) on center. 76 Series LP. SmartSide Lap may also be applied over code-approved nailable sheathing. • SmartLock Self-aligning lap should be installed in the same manner as 76.
Annons